Finished the tile on the step up to the doorway leading inside.
It was in the 90's every day there and he got back a week before the Flight MH370 went missing. While he was gone a got a couple little projects done like polyurethaning the closet doors. Mostly I was plowing and shoveling every night.
Travis spent some time organizing the garage and getting it just the way he wants it. We hung up some of the christmas gifts like the tool hanging rack. We still have to put up our kayak hoist and the ski rack up but things are looking much cleaner in there.
Realized I didn't have a photo of the front of the garage since both garage doors were in and the hardware installed on them. This was taken before the massive snow fall we got in Feb.
After Travis got back from Asia we decided we needed to get a move on finishing the breezeway so we can move on to siding once it gets nice out. Travis hired one of his Peru friends to come tape and mud. These photos were after the second application of the mud.
We have spent the last couple weekend skiing, trying to catch up for not going at all in February. Yesterday we went to Saddleback Mt. and it was their annual pond skimming/spring skiing day. It was sunny and 50 degrees. The nicest day so far this spring. Hard to believe it is almost April and we are not even getting above freezing on a regular basis yet. Today is is cold and Raining so we stayed inside and worked on Priming the ceiling and all the walls in the breezeway. This week I will take a tile sample to pick out the paint color.